Item |
Customer Information
|
Work Description
|
Completion Date
|
|
1 |
Supply, Install MSB, DBs and Feeder Pillars for Petronas Fire
Fighting Training Ground Paka |
Petronas KLCCB |
March 2000 |
|
2 |
Provision of Manpower, Equipments and Consumables For Replacement and
Upgrading of Faulty Explosion Proof Lighting at Tiong-B Platform.(P2/SO/F109) |
Petronas Carigali Sdn. Bhd-PMO |
August-September 2002 |
|
3 |
Electrical Works at Sek Men Keb Agama Kuala Abang, Dungun |
JKR |
Oct 2003 - Feb 2004 |
|
4 |
Upgrade of electrical and wiring systems at Sek Keb Nering in Kuala Berang |
JKR Letrik |
August 2003 |
|
5 |
Upgrading Of UPS For Fire And Gas System At PM 9 To Provide
Manpower & Materials At Tinggi-A & Tiong-A. |
Starr Kris Services Sdn.Bhd. |
December 2004
|
|
6 |
Provision of Upgrading of
Fire & Gas at PM-9 Platforms-Bekok A,B & C |
Petronas Carigali Sdn
Bhd |
October 2004 - December
2005 |
|
7 |
Provision of Upgrading of
Fire & Gas at PM-9 Platforms-Tiong A & Tinggi A |
Petronas Carigali Sdn
Bhd |
October 2004 - December
2005 |
|
8 |
Supply,Install,Test and Commision of 2 Unit of Stork
Centrifugal Pumps For Diesel + Petrol to Petronas GPP B. |
Petronas Gas
Berhad |
Aug 2000-Dec 2000 |
|
9 |
Proposed Upgrading of the Compound light at Bachelor
Married Flats Rantau Petronas Kerteh. |
PWPT |
September 2005 |
|
10 |
Kerja-kerja Kejuruteraan Elektrik di menara pengawal
pantai Kerteh Port. |
Kerteh Port |
Sept –Dec 2005 |
|
11 |
Upgrade of DB at GAC building Petronas Gas Berhad -
GPPA |
GPP-A |
Feb 2006 – April 2006 |
|
12 |
Penyelenggaraan Elektrik untuk Sekolah Kebangsaan
Pengkalan Ranggon. |
JKR |
July
2006 – September 2006 |
|
13 |
To supply, Installation & Commissioning of Emergency
Stop Button / Remove LED Indicator for Smoke Detector/FD @ CXTP |
VASTALUX/MRE/PCSB |
July 2006 – Dec
2006 |
|
14 |
Pendawaian Semula Elektrik & Keja-kerja berkaitan di SK
Seri Paka, SK Paka & SK PakaII. |
JKR Elektrik |
July 2006 – Sept 2006 |
|
15 |
Penyelenggaraan Elektrik untuk SK Pengkalan Ranggon, Kerteh. |
JKR Elektrik |
July 2006 – September 2006 |
|
16 |
Pengubahsuaian dan Menaiktaraf kerja-kerja Mekanikal
dan Elektrikal yang merangkumi Peralatan High Tension Peralatan High
Tension, Capacitor Bank, AMF Board dan Kerja-kerja berkaitan di Primula
Beach Resort Kuala Terengganu. |
PTB Resort Sdn
Bhd
|
August 2006 – Oct 2006 |
|
17 |
To troubleshoot and
repair existing panel c/w cable laying. Performed thermography scan |
PTB Resort Sdn Bhd |
September 2006 |
|
18 |
Supply, install and
calibrate MCCB and MK 1000 protective relay |
PTB Resort Sdn Bhd |
September 2006 |
|
19 |
Supply, Install, Termination and Testing of Electrical
cable from new Auto Change Over Switch Panel
to MSB, AMF Board and EMSB. |
PTB Resort Sdn Bhd |
September 2006 |
|
20 |
Supply, Install, Termination and Testing of Electrical cable from MSB to new Capacitor
Bank Panel including 1000A MCCB.
|
PTB Resort Sdn Bhd |
September 2006 |
|
21 |
To change the MSB and SSB for Ground floor and first floor at the
Garden Wing. To replace low insulation
resistance sub-main cable.
|
PTB Resort Sdn Bhd |
September 2006 |
|
22 |
To change the existing
Earth Fault & Overcurrent Relay. |
PTB Resort Sdn Bhd |
October 2006 |
|
23 |
To install surge protection device |
PTB Resort Sdn Bhd |
October 2006 |
|
24 |
To change the Switch
Fuse type breaker to MCCB type breaker. |
PTB Resort Sdn Bhd |
October 2006 |
|
25 |
o replace 3000A Air Circuit-Breaker (ACB)
-3000A 3pole ACB, Merlin Gerin
-SPAJ Protection Relay, ABB
-Panel, Internal wiring, Busbar, etc.Site
Installation, testing & commissioning.
|
PTB Resort Sdn Bhd |
October 2006 |
|
26 |
To replace 3000A Coupler
-
3000A 4pole Coupler ACB c/w Castell Keylock
-
Panel, Internal wiring, Busbar, etc.
Site
Installation, testing & commissioning.
|
PTB Resort Sdn Bhd |
October 2006 |
|
27 |
To replace 3000A Air Circuit-Breaker (ACB)
To replace 3000A Coupler |
PTB Resort Sdn Bhd |
October 2006 |
|
28 |
Troubleshoot of
existing SSB panel (AHU Panel) |
PTB Resort Sdn Bhd |
October 2006 |
|
29 |
Provision of Tool Room Electrical Work |
BP Petronas
Acetyls Sdn Bhd |
November 2006 |
|
30 |
Provision for the Laying Audio Cabling |
BP Petronas
Acetyls Sdn Bhd |
November 2006 |
|
31 |
Provision of Supply, Installation, Testing and
Commissioning of Standby Generator Set and Capacitor Bank for Petronas
Dagangan Berhad. |
Petronas Dagangan Berhad |
March 2007 – April 2007 |
|
32 |
Provision of Electrical and Fire Fighting Systems
Maintenance Services at Petronas Operation Complex (KOP) for Petronas
Carigali Sdn Bhd-PMO. |
PCSB-PMO |
March 2007 – February 2009 |
|
33 |
Provision of Supply manpower, Tools, and Material for
Electrical work and services, PA System and Telephone Services for the
Renovation of GAC Building and Ex-Knu Building at GPP-A |
Hadgente Design Sdn Bhd/PGB-GPPA |
March 2007 –Aug 2007 |
|
34 |
Provision of Supply and Install All the Equipment &
Accessories for the Street Lighting Project at BASF Services (M) Sdn Bhd,
Kawasan Perindustrian Gebeng, Kuantan. |
Lebak Engineering Sdn Bhd/BASF |
March 2007 – Dec 2007 |
|
35 |
Provision of Engineering, Procurement, Construction and
Commissioning (EPCC) of Concrete Pavement, Structural and Electrical Upgrade
Works at LPG Filling Plant, Kerteh, Terengganu – PDB |
MRH Construction & Services Sdn Bhd/MRE/PDB |
November 2007 – Dec 2007 |
|
36 |
Provision of replacement 11KV High Fusing Unit & Oil
Link Unit with Vacuum Circuit Breakers and Accessories at the Bomba Sub
Station, GPPA, Kerteh, Terengganu. |
Petronas Gas Berhad |
December 2007 – Jan 2008 |
|
37 |
Provision of Lay New Cable from MRR to K470 at Ethylene |
Ethylene (M) Sdn Bhd |
February 2008 |
|
38 |
Provision of upgrading Fire Notification System at BPCM,Gebeng. |
Tanjung CSI Sdn Bhd |
March 2008-July 2008 |
|
39 |
Upgrading works for admin building at kuantan Bulk Depot,Tanjung
Gelang,Kuantan. |
Petronas Dagangan
Berhad |
March 2008-April 2008 |
|
40 |
Membekal tenaga kerja, peralatan, jentera dan yang berkaitan dengannya bagi
memasang 2 unit meter control starter panel. |
Kilang Sawit Panji Alam
Sdn Bhd |
July 2008 |
|
41 |
Provision of Supply ,
Install, Commission Bus Coupler at Petronas Penapisan (T) Sdn Bhd. |
Petronas Penapisan
(T) Sdn Bhd |
September 2008-
On going |
|
42 |
Provision of TMR upgrading
system project at GPP 5 |
Tanjung CSI Sdn Bhd |
Novermber 2008 – On going |
|
43 |
Provision Of Upgrading Of Circuit Breaker (Acb)
For Erb West And Samarang Platforms For Petronas Carigali Sdn Bhd-Sabah
Operation- (Pcsb-Sbo) |
Petronas Carigali Sdn Bhd-SBO |
March 2009 – On Going |
|
44 |
Provision of Electrical Cabling & Wiring Works
(Emergency Lighting Replacement Project) at PGB. |
Petrogas Gas Berhad |
July 2009 – On Going |
|
45 |
Provision of Supply &
Install of FGS System Devices at MLNG1 |
Tanjung CSI/MLNG |
January 2010 – On Going |
|
46 |
Provision to Upgrade Motor
Control Centre (MCC) 2 & 3 at Tembungo – A Platform for PCSB-SBO. |
Petronas Carigali Sdn Bhd-SBO |
July 2010 |
|
47 |
Provision of Electrical
and Fire Fighting Systems Maintenance Services at Petronas Operation Complex
(KOP) for Petronas Carigali Sdn Bhd-PMO. |
PCSB-PMO /
MRE |
August 2010 – July 2013 |
|
48 |
Provision of Supply,
Install, Testing & Commissioning of Undistruptable Power Supply(UPS). |
Tanjung Newenergy/PCSB-PMO |
December 2010 |
|
49 |
Provision to Supply,
Deliver, Testing & Commission of Three(3) New Power Transformers for Duyong
Platform for PCSB-PMO. |
MRE/PCSB-PMO |
Mei 2010 |
|
50 |
Provision of Revamp
Distributed Control System at TCOT & OSC. |
Tanjung CSI/PCSB-PMO |
January 2011 – On Going |
|
51 |
Provision for SIS
Upgrading at Bayan Platform |
Trisystem |
February 2011 – On Going |
|
52 |
Guntong-D (GUD) Fuel Gas
Superheater Upgrade Project |
Ranhill WorleyParsons/EMEPMI |
April 2011 – On going |